Information
| Unit | CEYHAN VOCATIONAL SCHOOL |
| Code | INT257 |
| Name | Building Site Organization |
| Term | 2017-2018 Academic Year |
| Semester | 3. Semester |
| Duration (T+A) | 2-0 (T-A) (17 Week) |
| ECTS | 2 ECTS |
| National Credit | 2 National Credit |
| Teaching Language | Türkçe |
| Level | Ön Lisans Dersi |
| Type | Normal |
| Label | C Compulsory |
| Mode of study | Yüz Yüze Öğretim |
| Catalog Information Coordinator | Öğr. Gör. MAHMUT TANSU KAYA |
| Course Instructor |
SUPHİ CİVELEK
(Güz)
(A Group)
(Ins. in Charge)
|
Course Goal / Objective
To teach all phases in the pre-implementation and implementation phase of project
Course Content
Definitions, concepts, Land selection, preparation of projects, Plans to be included in the project files, Procurement Law (State and the Public Procurement Law), Procurement document regulation ve procurement preparation, Methods of procurement, to be made of contract, Delivery of place and business program, The establishment of the construction site (its organization), Occupational health and safety measures, Preparation of manufacturing to be begun to manufacturing, Measured drawing book, attachment book, tally book, surveillance book, construction business book, green book, construction site book, Preparing progress payment files, Temporary and final acceptance, building inspection
Course Precondition
Resources
Notes
Course Learning Outcomes
| Order | Course Learning Outcomes |
|---|---|
| LO01 | Learn the construction site and construction machinery |
| LO02 | Learn about possible work accidents |
| LO03 | Prepares progress payment files |
| LO04 | Learn to calculate quantity |
Relation with Program Learning Outcome
| Order | Type | Program Learning Outcomes | Level |
|---|---|---|---|
| PLO01 | Bilgi - Kuramsal, Olgusal | Learns basic knowledge in the field of Mathematics, Science and Construction Technology on top of the qualifications gained in general or vocational secondary education. | |
| PLO02 | Bilgi - Kuramsal, Olgusal | Learns the classification of buildings, the construction methods to be used according to this classification, the construction of the buildings in accordance with the projects and specifications, the information that will fulfill the duties expected from the construction technician in the execution of the works related to the construction technology. | |
| PLO03 | Bilgi - Kuramsal, Olgusal | Learns the main materials used in the construction of buildings, properties of materials, classification of floors. | |
| PLO04 | Bilgi - Kuramsal, Olgusal | Learns the project, specifications, insurance, tax and health institutions legislation, tender processes for construction works and the main components of contracts, covering their own field. | 5 |
| PLO05 | Bilgi - Kuramsal, Olgusal | Interprets architectural and static projects, specifications, contracts, study reports for floors. | |
| PLO06 | Bilgi - Kuramsal, Olgusal | Learns the bureaucratic procedures with official institutions related to construction works. | |
| PLO07 | Bilgi - Kuramsal, Olgusal | Develops solution proposals by identifying general problems encountered in building construction or ground works by using theoretical knowledge and skills. | 4 |
| PLO08 | Bilgi - Kuramsal, Olgusal | Interprets the data obtained from the construction works at the construction site and presents a report to the superiors about the developments. | 5 |
| PLO09 | Bilgi - Kuramsal, Olgusal | Arranges progress payment by making the quantity and discovery (cost) procedures related to the building. | 5 |
| PLO10 | Bilgi - Kuramsal, Olgusal | Makes drawings of architectural and static (reinforced concrete projects) prepared by the relevant technical staff. | |
| PLO11 | Bilgi - Kuramsal, Olgusal | Explains the designs, applications or thoughts related to construction technology, and the solutions clearly, if any, to his colleagues, superiors, and the people and groups they serve. | 5 |
| PLO12 | Bilgi - Kuramsal, Olgusal | Evaluates the topographic structure of the construction site and uses measuring instruments to detect this structure. | |
| PLO13 | Bilgi - Kuramsal, Olgusal | Works independently by using the knowledge and skills she has gained and supervises the personnel. | |
| PLO14 | Bilgi - Kuramsal, Olgusal | Explains the projects, applications and studies related to construction technology to the related people clearly and effectively and work as a team accordingly. | |
| PLO15 | Beceriler - Bilişsel, Uygulamalı | Critically looks at her/his knowledge of construction technology-related issues. | |
| PLO16 | Beceriler - Bilişsel, Uygulamalı | Always identify situations that require learning by exchanging information, and thus gains the awareness of continuous learning. | |
| PLO17 | Yetkinlikler - Bağımsız Çalışabilme ve Sorumluluk Alabilme Yetkinliği | In addition to having basic computer skills, he/she uses office and database programs. | |
| PLO18 | Yetkinlikler - Bağımsız Çalışabilme ve Sorumluluk Alabilme Yetkinliği | Follows the information in the field and communicates with colleagues by using a foreign language at least at the A2 General Level of the European Language Portfolio. | |
| PLO19 | Yetkinlikler - Bağımsız Çalışabilme ve Sorumluluk Alabilme Yetkinliği | Gains communication skills that will establish relations with the public as well as the personnel he/she works with. | 4 |
| PLO20 | Yetkinlikler - Öğrenme Yetkinliği | In addition to having occupational health and safety, quality assurance and standard, environmental protection knowledge and ethical values related to her profession, she/he also gains the awareness of observing social, scientific and moral values. | 5 |
Week Plan
| Week | Topic | Preparation | Methods |
|---|---|---|---|
| 1 | Definitions, concepts | To be studied from the lecture notes of the subject, practice | |
| 2 | Land selection, preparation of projects | To be studied from the lecture notes of the subject, practice | |
| 3 | Plans to be included in the project files | To be studied from the lecture notes of the subject, practice | |
| 4 | Procurement Law (State and the Public Procurement Law) | To be studied from the lecture notes of the subject, practice | |
| 5 | Procurement document regulation ve procurement preparation | To be studied from the lecture notes of the subject, practice | |
| 6 | Methods of procurement, to be made of contract | To be studied from the lecture notes of the subject, practice | |
| 7 | Delivery of place and business program | To be studied from the lecture notes of the subject, practice | |
| 8 | Mid-Term Exam | ||
| 9 | The establishment of the construction site (its organization) | To be studied from the lecture notes of the subject, practice | |
| 10 | Occupational health and safety measures | To be studied from the lecture notes of the subject, practice | |
| 11 | Preparation of manufacturing | To be studied from the lecture notes of the subject, practice | |
| 12 | To be begun to manufacturing | To be studied from the lecture notes of the subject, practice | |
| 13 | Measured drawing book, attachment book, tally book, surveillance book, construction business book, green book, construction site book | To be studied from the lecture notes of the subject, practice | |
| 14 | Preparing progress payment files | To be studied from the lecture notes of the subject, practice | |
| 15 | Temporary and final acceptance, building inspection | To be studied from the lecture notes of the subject, practice | |
| 16 | Term Exams | ||
| 17 | Term Exams |
Assessment (Exam) Methods and Criteria
| Assessment Type | Midterm / Year Impact | End of Term / End of Year Impact |
|---|---|---|
| 1. Midterm Exam | 100 | 40 |
| General Assessment | ||
| Midterm / Year Total | 100 | 40 |
| 1. Final Exam | - | 60 |
| Grand Total | - | 100 |
Student Workload - ECTS
| Works | Number | Time (Hour) | Workload (Hour) |
|---|---|---|---|
| Course Related Works | |||
| Class Time (Exam weeks are excluded) | 14 | 2 | 28 |
| Out of Class Study (Preliminary Work, Practice) | 14 | 1 | 14 |
| Assesment Related Works | |||
| Homeworks, Projects, Others | 0 | 0 | 0 |
| Mid-term Exams (Written, Oral, etc.) | 1 | 4 | 4 |
| Final Exam | 1 | 8 | 8 |
| Total Workload (Hour) | 54 | ||
| Total Workload / 25 (h) | 2,16 | ||
| ECTS | 2 ECTS | ||