INT257 Building Site Organization

2 ECTS - 2-0 Duration (T+A)- 3. Semester- 2 National Credit

Information

Unit CEYHAN VOCATIONAL SCHOOL
Code INT257
Name Building Site Organization
Term 2020-2021 Academic Year
Semester 3. Semester
Duration (T+A) 2-0 (T-A) (17 Week)
ECTS 2 ECTS
National Credit 2 National Credit
Teaching Language Türkçe
Level Ön Lisans Dersi
Type Normal
Label C Compulsory
Mode of study Uzaktan Öğretim
Catalog Information Coordinator Öğr. Gör. MAHMUT TANSU KAYA
Course Instructor Gül Derya DEMİR (Güz) (A Group) (Ins. in Charge)


Course Goal / Objective

To teach all phases in the pre-implementation and implementation phase of project

Course Content

Definitions, concepts, Land selection, preparation of projects, Plans to be included in the project files, Procurement Law (State and the Public Procurement Law), Procurement document regulation ve procurement preparation, Methods of procurement, to be made of contract, Delivery of place and business program, The establishment of the construction site (its organization), Occupational health and safety measures, Preparation of manufacturing to be begun to manufacturing, Measured drawing book, attachment book, tally book, surveillance book, construction business book, green book, construction site book, Preparing progress payment files, Temporary and final acceptance, building inspection

Course Precondition

Resources

Notes



Course Learning Outcomes

Order Course Learning Outcomes
LO01 Learn the construction site and construction machinery
LO02 Learn about possible work accidents
LO03 Prepares progress payment files
LO04 Learn to calculate quantity


Relation with Program Learning Outcome

Order Type Program Learning Outcomes Level


Week Plan

Week Topic Preparation Methods
1 Definitions, concepts To be studied from the lecture notes of the subject, practice
2 Land selection, preparation of projects To be studied from the lecture notes of the subject, practice
3 Plans to be included in the project files To be studied from the lecture notes of the subject, practice
4 Procurement Law (State and the Public Procurement Law) To be studied from the lecture notes of the subject, practice
5 Procurement document regulation ve procurement preparation To be studied from the lecture notes of the subject, practice
6 Methods of procurement, to be made of contract To be studied from the lecture notes of the subject, practice
7 Delivery of place and business program To be studied from the lecture notes of the subject, practice
8 Mid-Term Exam
9 The establishment of the construction site (its organization) To be studied from the lecture notes of the subject, practice
10 Occupational health and safety measures To be studied from the lecture notes of the subject, practice
11 Preparation of manufacturing To be studied from the lecture notes of the subject, practice
12 To be begun to manufacturing To be studied from the lecture notes of the subject, practice
13 Measured drawing book, attachment book, tally book, surveillance book, construction business book, green book, construction site book To be studied from the lecture notes of the subject, practice
14 Preparing progress payment files To be studied from the lecture notes of the subject, practice
15 Temporary and final acceptance, building inspection To be studied from the lecture notes of the subject, practice
16 Term Exams
17 Term Exams


Assessment (Exam) Methods and Criteria

Assessment Type Midterm / Year Impact End of Term / End of Year Impact
1. Homework 100 40
General Assessment
Midterm / Year Total 100 40
1. Final Exam - 60
Grand Total - 100


Student Workload - ECTS

Works Number Time (Hour) Workload (Hour)
Course Related Works
Class Time (Exam weeks are excluded) 14 2 28
Out of Class Study (Preliminary Work, Practice) 14 1 14
Assesment Related Works
Homeworks, Projects, Others 0 0 0
Mid-term Exams (Written, Oral, etc.) 1 4 4
Final Exam 1 8 8
Total Workload (Hour) 54
Total Workload / 25 (h) 2,16
ECTS 2 ECTS