Information
| Unit | CEYHAN VOCATIONAL SCHOOL |
| Code | INT263 |
| Name | Highway Construction |
| Term | 2020-2021 Academic Year |
| Semester | 3. Semester |
| Duration (T+A) | 2-0 (T-A) (17 Week) |
| ECTS | 3 ECTS |
| National Credit | 2 National Credit |
| Teaching Language | Türkçe |
| Level | Ön Lisans Dersi |
| Type | Normal |
| Label | E Elective |
| Mode of study | Uzaktan Öğretim |
| Catalog Information Coordinator | Öğr. Gör. Dr. ALİ GÖKOĞLU |
| Course Instructor |
Öğr. Gör. Dr. ALİ GÖKOĞLU
(Güz)
(A Group)
(Ins. in Charge)
|
Course Goal / Objective
To teach all phases of pre-construction and implementation phase
Course Content
Concepts, transportation systems, Highway standards, Highway route (road route) and technical etudes, the application of precise route, Maps and field observations, Horizontal curves, Vertical curves, Inclination, Cross-section, longitudinal nivelman, Fill and splitting calculations, Land spread by Brückner curve, Art structures, Road infrastructure and superstructure materials, Calculation of the costs of road, Project Application
Course Precondition
Resources
Notes
Course Learning Outcomes
| Order | Course Learning Outcomes |
|---|---|
| LO01 | Learns all phases of pre-construction and implementation phase |
| LO02 | Learns Highway standards |
| LO03 | Lerans Highway route (road route) and technical etudes, the application of precise route |
| LO04 | Learns Horizontal and vertical curves |
| LO05 | Makes calculation of the costs of road |
Relation with Program Learning Outcome
| Order | Type | Program Learning Outcomes | Level |
|---|
Week Plan
| Week | Topic | Preparation | Methods |
|---|---|---|---|
| 1 | Concepts, transportation systems | To be studied from the lecture notes of the subject, practice | |
| 2 | Highway standards | To be studied from the lecture notes of the subject, practice | |
| 3 | Highway route (road route) and technical etudes, the application of precise route | To be studied from the lecture notes of the subject, practice | |
| 4 | Maps and field observations | To be studied from the lecture notes of the subject, practice | |
| 5 | Horizontal curves | To be studied from the lecture notes of the subject, practice | |
| 6 | Vertical curves | To be studied from the lecture notes of the subject, practice | |
| 7 | Inclination | To be studied from the lecture notes of the subject, practice | |
| 8 | Mid-Term Exam | ||
| 9 | Cross-section, longitudinal nivelman | To be studied from the lecture notes of the subject, practice | |
| 10 | Fill and splitting calculations | To be studied from the lecture notes of the subject, practice | |
| 11 | Land spread by Brückner curve | To be studied from the lecture notes of the subject, practice | |
| 12 | Art structures | To be studied from the lecture notes of the subject, practice | |
| 13 | Road infrastructure and superstructure materials | To be studied from the lecture notes of the subject, practice | |
| 14 | Calculation of the costs of road | To be studied from the lecture notes of the subject, practice | |
| 15 | Project Application | To be studied from the lecture notes of the subject, practice | |
| 16 | Term Exams | ||
| 17 | Term Exams |
Assessment (Exam) Methods and Criteria
| Assessment Type | Midterm / Year Impact | End of Term / End of Year Impact |
|---|---|---|
| 1. Homework | 100 | 40 |
| General Assessment | ||
| Midterm / Year Total | 100 | 40 |
| 1. Final Exam | - | 60 |
| Grand Total | - | 100 |
Student Workload - ECTS
| Works | Number | Time (Hour) | Workload (Hour) |
|---|---|---|---|
| Course Related Works | |||
| Class Time (Exam weeks are excluded) | 14 | 2 | 28 |
| Out of Class Study (Preliminary Work, Practice) | 14 | 2 | 28 |
| Assesment Related Works | |||
| Homeworks, Projects, Others | 0 | 0 | 0 |
| Mid-term Exams (Written, Oral, etc.) | 1 | 6 | 6 |
| Final Exam | 1 | 16 | 16 |
| Total Workload (Hour) | 78 | ||
| Total Workload / 25 (h) | 3,12 | ||
| ECTS | 3 ECTS | ||